ISD
Eng 

Press Centre

2011

Successful launching of the continuous casting machine №3 at Dneprovsky Metallurgical Works

03.02.2011 | Press-releases

On 28th January, 2011 hot testings had been started at the continuous casting machine №3 at Dneprovsky Metallurgical Plant. The first batch of continuously cast products has been manufactured.

 
next

Archive

© 2003-2018 ISD Corporation

Tel.: +380 44 389-41-00
Fax: +380 44 389-41-11

 
 
Made by
SKS Design, 2009